Real findings from live project reviews. Every one traceable.
The URUS use case register — actual discrepancies the engine surfaced across live capital projects, anonymized for client confidentiality.
Equipment tags and document references have been substituted. Findings, values and engineering reasoning are unchanged from the live reviews.
-
Undersized cable — ampacity shortfall quantified
[ Single Line Diagram ↔ Cable Schedule ]
InterpretationCross-referenced the SLD rating against the Cable Schedule tabulation; identified an ampacity shortfall and quantified it.
Why it mattersPrevents electrical failures: fire, motor trip, downtime. Protects compressor availability on a critical production train.
Report claritySafety, reliability and operational risks of the undersized cable explained explicitly.
-
20% design margin contradicts the standard
[ Basis of Design ↔ Governing Standard ]
InterpretationPicked up the explicit “20% margin” mention in the basis of design table, and automatically compared it against the governing standard.
Why it mattersSafeguards CAPEX efficiency by avoiding unnecessary overspend, and ensures operational compliance from FEED stage onward.
Report clarityCost and operational implications of the oversizing explained in full.
-
Pressure mismatch — 120 barg vs 131.3 barg
[ Design Basis ↔ PFD ]
InterpretationInterpreted tabulated operating data on the PFD and cross-checked it against the textual design basis; identified the mismatch.
Why it mattersPrevents costly overdesign of compression and piping systems; safeguards alignment between design basis, PFDs and downstream deliverables.
Report clarityIssue presented with context, the gap quantified, and a clear actionable resolution given.
-
Dimensional mismatch on equipment A-4010
[ Detailed Layout Drawing ↔ Master Equipment List ]
InterpretationRead a layout drawing with multiple annotations and symbols; correctly linked equipment tag A-4010 between the drawing and the MEL.
Why it mattersCatching the dimensional mismatch early prevents late-stage rework or clashes.
RecommendationVerify with the vendor, then update the MEL and drawings. Flagged as a decision-ready recommendation.
-
Mis-tagged equipment — V-30502 vs V-3050
[ P&ID ↔ Equipment Datasheet ]
InterpretationUnderstood equipment tagging rules across documents and detected an incorrect tag number on the datasheet.
Why it mattersDetecting the mis-tag early avoids confusion in equipment identification during design, procurement and operation.